Plate and hose kit
Individual components supplied for installation by the server integrator. Identify who completes joining, routing, tightening and the final assembled leak test.
Bring cold plates, hoses and matched connectors into a controlled server assembly. For Australian and New Zealand integrators, the quotation starts with a chassis revision, device load map and a clear handover point to the rack circuit.
Custom component supply. Configuration and acceptance criteria are agreed against your drawing.

List the plates, hoses, connector halves, distribution parts and instrumentation supplied inside the agreed assembly boundary. Identify the supply and return handover points. Rack manifolds, CDU equipment, coolant filling and commissioning need an explicit scope.
Individual components supplied for installation by the server integrator. Identify who completes joining, routing, tightening and the final assembled leak test.
A defined set of plates, hoses and fittings assembled to a released drawing. Define shipping supports, protective caps and which tests cover the assembled scope.
A separate, agreed interface to the rack manifold or CDU. Do not assume mating connectors, filling equipment or site labour are included with a server kit.
| BOM group | Required definition | Integration check |
|---|---|---|
| Cold plates | Device interface drawing, revision, quantity and mounting stack. | Clearance to memory, power devices, retainers and neighbouring boards. |
| Hose assemblies | Fluid compatibility, length, internal diameter, bend limits and termination. | No kinks or side loading when the chassis is closed or serviced. |
| Connections | Manufacturer, full part number, male/female halves, seal material and flow direction. | Mechanical fit alone does not prove compatible valving or sealing. |
| Instrumentation | Sensor type, range, location, connector and responsible controller. | A sensor supplied without its controller is not a complete monitoring system. |
| Service parts | Caps, replacement seals, labels and agreed spares. | The operator can identify and replace the correct revision. |
Interface schematic only; the actual circuit may contain series or parallel branches.
Components in a series path contribute to the total pressure loss at that path’s flow. Parallel branches share the pressure difference between their common junctions, but their flow rates need not be equal. Specify each target branch flow and any balancing provisions.
For staged GPU deployment or service isolation, check the operating cases the rack will actually see. A total-flow reading at the rack does not prove adequate flow through every processor plate. A lower-power branch can still receive excessive flow while a restrictive branch is starved.
For a remote Australian or New Zealand installation, agree the spare-hose and connector strategy before dispatch. Local inventory, field response time and on-site commissioning are only included when confirmed in the quotation.
The assembly package should connect a numbered BOM to the hose-routing drawing, connector schedule and factory test record. Ask for installation and service instructions for the supplied scope, with residual-fluid and storage conditions identified.
No verified model-specific performance PDF is available for this reference. The button requests a drawing and specification review; it is not a datasheet download.
Request drawings and specificationConstruction reference: ToneCooling catalogue page. Reference images do not establish performance or qualification. The accepted drawing revision and agreed test conditions define the supplied component.
For equipment selection, review the CDU product range and model PDFs. For the facility/server boundary, use the data-centre liquid-cooling architecture page. Neither link changes the BOM included in a server-loop quotation.
Identify a kit or a factory-assembled loop, plus any separately quoted rack equipment. State whether the enquiry includes sensors, mating connectors, mounting hardware, coolant or spares. Installation and server-platform qualification must be allocated explicitly.
Prepare my enquiry by emailOpens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.
ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.
No. Even similarly named platforms can have different PCB revisions, mounting stacks and chassis clearances. Confirm the actual interface drawing and released BOM.
Do not assume so. Match both coupling halves by the manufacturer’s approved part numbers and check seals, valves, flow restriction and operating conditions.
No. Transport, installation and connector mating occur afterwards. Define the on-site inspection, filling, venting and leak-check procedure for the installed assembly.