Equipment selection · Australia & New Zealand

Integrated Pump Skids

Prepare a circulation package for an Australian or New Zealand cooling installation. Compare four TC-IPS references, then specify the pump curve, controls, maintenance access and interfaces for your actual loop.

Integrated Pump Skids series reference equipment
Series reference image only. It does not establish the exact model configuration, dimensions, connections or included accessories.

Selection in brief

A pump skid circulates coolant through a specified hydraulic circuit. It does not by itself reject the loop heat to outdoor air or separate facility water from a technology loop. Select the pump operating point and define the equipment boundary before using the catalogue loop-load reference.

Compare models and download datasheets

Model specifications and project selection

Catalogue reference values

ModelCatalogue loadFlow referenceEnvelope
TC-IPS-20002000 kW loop reference5000 L/min2200 × 1500 × 2000 mm
TC-IPS-16001600 kW loop reference4000 L/min2200 × 1500 × 2000 mm
TC-IPS-10001000 kW loop reference3200 L/min2200 × 1400 × 2000 mm
TC-IPS-600600 kW loop reference2000 L/min2000 × 1400 × 2000 mm

Source: linked ToneCooling model datasheets. Catalogue values are references, not independently verified performance or a guarantee that every listed value applies at one simultaneous duty point. Confirm fluid, temperature, external pressure, electrical configuration, dimensions and mass basis in the accepted selection.

Select circulation duty, not a stand-alone cooling capacity

The 600–2000 kW figures identify catalogue loop references. They are not a pump-generated cooling capacity. Provide the required volume flow and the external pressure loss between named skid connections, including the fluid and temperature used in the calculation.

Show whether the skid belongs to the facility circuit, an outdoor heat-rejection loop or another defined circuit. Identify the heat exchanger and heat-rejection equipment elsewhere in the system. This prevents a circulation package from being mistaken for a complete CDU plant.

Selection itemInput or referenceRequired confirmation
Hydraulic pointFlow, external differential pressure, fluid concentration and operating temperature.Request the selected pump curve and identify internal skid losses separately.
Control boundaryRequired pressure or flow control, sensor location and BMS interface.Agree command ownership, alarms and response to a lost signal.
Service caseDuty, standby and maintenance operating cases.Specify the required retained flow; pump count alone does not prove redundancy.
InstallationConnection drawing, access, lifting, electrical supply and drain arrangement.Confirm the delivered envelope and site responsibilities in the offer.

Agree the equipment and acceptance boundary

List the CDU or skid, connections, sensors, controls and accessories included in the offer. Allocate installation, water treatment, flushing, filling, electrical connection and commissioning to named project parties. Australian or New Zealand enquiry support does not imply local stock, on-site installation or an included service contract.

Request the controlled drawing, selected duty, component schedule and agreed factory test records. Confirm site electrical requirements and applicable conformity documentation for the offered configuration; a catalogue voltage or a pump arrangement is not proof of project compliance or redundancy.

Continue the selection

Equipment selection enquiry

Request Integrated Pump Skids selection

Send the following conditions for a configuration-specific offer. Capacity, included equipment, documents, delivery terms and installation responsibilities must be confirmed in writing.

Prepare my enquiry by email

Opens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.

Include these project inputs

  • Flow and pressure duty at named skid interfaces
  • Fluid product and concentration / temperature range
  • Piping schematic and external equipment schedule
  • Control signals and duty / standby requirements
  • Plant-room access, destination and commissioning scope

ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.

Engineering questions

Does TC-IPS-2000 cool a 2000 kW load on its own?

No. The catalogue load is a loop reference. Heat removal requires the other specified heat-transfer and heat-rejection equipment.

Pump skids models

TC-IPS-600TC-IPS-1000TC-IPS-1600TC-IPS-2000

Other CDU series

In-rack liquid-to-liquid CDUsIn-row liquid-to-liquid CDUsIn-rack liquid-to-air CDUsIn-row liquid-to-air CDUsDry coolersAll CDUs