Selection in brief

An in-rack liquid-to-liquid CDU places the heat-exchange and circulation interface within the rack envelope. It still needs facility-water connections, usable rack space, structural support and a verified external hydraulic duty for the connected equipment.

Compare models and download datasheets

Catalogue reference values

ModelCatalogue loadFlow referenceEnvelope
TC-CDU-L250R250 kW400 L/min482 × 870 × 265 mm
TC-CDU-L200R200 kW320 L/min482 × 870 × 265 mm
TC-CDU-L150R150 kW240 L/min482 × 870 × 217.2 mm
TC-CDU-L120R120 kW190 L/min482 × 870 × 217.2 mm
TC-CDU-L100R100 kW160 L/min482 × 870 × 177.8 mm
TC-CDU-L50R50 kW160 L/min482 × 870 × 177.8 mm
TC-CDU-L35R35 kW120 L/min482 × 870 × 177.8 mm

Source: linked ToneCooling model datasheets. Catalogue values are references, not independently verified performance or a guarantee that every listed value applies at one simultaneous duty point. Confirm fluid, temperature, external pressure, electrical configuration, dimensions and mass basis in the accepted selection.

Reserve more than the nominal rack height

The chassis envelope does not include every installation allowance. Confirm rail arrangement, rack depth, connection projection, hose bend radius and withdrawal space. A nominal rack width or U height does not establish compatibility with a particular rack or OCP format.

Decide how the rack is isolated, drained and serviced without damaging adjacent electronics. Map supply and return connections and agree leak-detection ownership. Keep the facility circuit specification distinct from the coolant accepted by the server cold plates.

Selection itemInput or referenceRequired confirmation
Rack fitRail drawing, usable depth, U allocation and mass allowance.Check support loads and populated-rack service access.
ConnectionsPort positions, mating fittings and hose route.Allow bend radius, isolation and connection removal space.
Thermal boundaryFacility inlet and technology supply/return requirements.Confirm a simultaneous rated operating point.
Hydraulic boundaryServer branch schedule and pressure budget.Verify external duty after the selected CDU internal losses.

Agree the equipment and acceptance boundary

List the CDU or skid, connections, sensors, controls and accessories included in the offer. Allocate installation, water treatment, flushing, filling, electrical connection and commissioning to named project parties. Australian or New Zealand enquiry support does not imply local stock, on-site installation or an included service contract.

Request the controlled drawing, selected duty, component schedule and agreed factory test records. Confirm site electrical requirements and applicable conformity documentation for the offered configuration; a catalogue voltage or a pump arrangement is not proof of project compliance or redundancy.

Continue the selection

Equipment selection enquiry

Request In-Rack Liquid-to-Liquid CDUs selection

Send the following conditions for a configuration-specific offer. Capacity, included equipment, documents, delivery terms and installation responsibilities must be confirmed in writing.

Prepare my enquiry by email

Opens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.

Include these project inputs

  • Rack / rail drawing and allocated U space
  • Facility-water availability and technology-loop temperature targets
  • Server branch flow and differential-pressure requirements
  • Exact mating connections, hoses and leak-detection scope
  • Electrical connection, service sequence and delivery destination

ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.

Engineering questions

Does a 482 mm chassis prove it fits any rack?

No. Rail geometry, depth, loads, fittings and service clearances still require verification against the actual rack drawing.

In-rack liquid-to-liquid models

TC-CDU-L35RTC-CDU-L50RTC-CDU-L100RTC-CDU-L120RTC-CDU-L150RTC-CDU-L200RTC-CDU-L250R

Other CDU series

In-row liquid-to-liquid CDUsIn-rack liquid-to-air CDUsIn-row liquid-to-air CDUsDry coolersPump skidsAll CDUs