TC-CDU-L250R
TC-CDU-L250R specifications and selection
Download TC-CDU-L250R PDFFree PDF · no form required.
Review seven TC-CDU-L rack references for Australian and New Zealand equipment projects. Compare the catalogue dimensions and flow first, then check mounting, rear connections and rack service access.

An in-rack liquid-to-liquid CDU places the heat-exchange and circulation interface within the rack envelope. It still needs facility-water connections, usable rack space, structural support and a verified external hydraulic duty for the connected equipment.
TC-CDU-L250R specifications and selection
Download TC-CDU-L250R PDFFree PDF · no form required.
TC-CDU-L200R specifications and selection
Download TC-CDU-L200R PDFFree PDF · no form required.
TC-CDU-L150R specifications and selection
Download TC-CDU-L150R PDFFree PDF · no form required.
TC-CDU-L120R specifications and selection
Download TC-CDU-L120R PDFFree PDF · no form required.
Free PDF · no form required.
TC-CDU-L50R specifications and selection
Download TC-CDU-L50R PDFFree PDF · no form required.
TC-CDU-L35R specifications and selection
Download TC-CDU-L35R PDFFree PDF · no form required.
| Model | Catalogue load | Flow reference | Envelope |
|---|---|---|---|
| TC-CDU-L250R | 250 kW | 400 L/min | 482 × 870 × 265 mm |
| TC-CDU-L200R | 200 kW | 320 L/min | 482 × 870 × 265 mm |
| TC-CDU-L150R | 150 kW | 240 L/min | 482 × 870 × 217.2 mm |
| TC-CDU-L120R | 120 kW | 190 L/min | 482 × 870 × 217.2 mm |
| TC-CDU-L100R | 100 kW | 160 L/min | 482 × 870 × 177.8 mm |
| TC-CDU-L50R | 50 kW | 160 L/min | 482 × 870 × 177.8 mm |
| TC-CDU-L35R | 35 kW | 120 L/min | 482 × 870 × 177.8 mm |
Source: linked ToneCooling model datasheets. Catalogue values are references, not independently verified performance or a guarantee that every listed value applies at one simultaneous duty point. Confirm fluid, temperature, external pressure, electrical configuration, dimensions and mass basis in the accepted selection.
The chassis envelope does not include every installation allowance. Confirm rail arrangement, rack depth, connection projection, hose bend radius and withdrawal space. A nominal rack width or U height does not establish compatibility with a particular rack or OCP format.
Decide how the rack is isolated, drained and serviced without damaging adjacent electronics. Map supply and return connections and agree leak-detection ownership. Keep the facility circuit specification distinct from the coolant accepted by the server cold plates.
| Selection item | Input or reference | Required confirmation |
|---|---|---|
| Rack fit | Rail drawing, usable depth, U allocation and mass allowance. | Check support loads and populated-rack service access. |
| Connections | Port positions, mating fittings and hose route. | Allow bend radius, isolation and connection removal space. |
| Thermal boundary | Facility inlet and technology supply/return requirements. | Confirm a simultaneous rated operating point. |
| Hydraulic boundary | Server branch schedule and pressure budget. | Verify external duty after the selected CDU internal losses. |
List the CDU or skid, connections, sensors, controls and accessories included in the offer. Allocate installation, water treatment, flushing, filling, electrical connection and commissioning to named project parties. Australian or New Zealand enquiry support does not imply local stock, on-site installation or an included service contract.
Request the controlled drawing, selected duty, component schedule and agreed factory test records. Confirm site electrical requirements and applicable conformity documentation for the offered configuration; a catalogue voltage or a pump arrangement is not proof of project compliance or redundancy.
Send the following conditions for a configuration-specific offer. Capacity, included equipment, documents, delivery terms and installation responsibilities must be confirmed in writing.
Prepare my enquiry by emailOpens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.
ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.
No. Rail geometry, depth, loads, fittings and service clearances still require verification against the actual rack drawing.