Two circuit boundaries
Identify facility-water supply and return conditions separately from the technology-cooling supply and return conditions.
Assess the TC-CDU-L120R for Australian and New Zealand integration. The catalogue lists 120 kW, 190 L/min and a 482 × 870 × 217.2 mm envelope; confirm the simultaneous duty and installed configuration.
Model datasheet link · no form required · confirm the document revision and quoted configuration.

No. The catalogue supply label is a reference. Confirm the offered voltage range, frequency, earthing, connector and protection with the site electrical designer.
The L120R lists a 120 kW capacity reference, 190 L/min and AC 220 V, 50/60 Hz. This catalogue label does not confirm the permitted voltage range, connector, protection or compatibility with an Australian or New Zealand installation.
Confirm clearance for the 870 mm listed body depth plus connections and service access. Compare the 5U L120R with the 4U L100R using actual coolant conditions and accepted duty, not only the small change in nominal capacity.
Conceptual system boundary only. Connections, flow direction and controls require a project schematic.
Identify facility-water supply and return conditions separately from the technology-cooling supply and return conditions.
Check rack format, available height, mounting points and connections. A rack-height label alone does not establish fit.
Request the usable pump curve and operating point with the agreed redundancy state. Pump count alone does not prove full-duty redundancy.
Source: ToneCooling catalogue model data and the linked model datasheet. Listed values are selection references and are not asserted to describe one simultaneous duty point. Confirm coolant properties, inlet/outlet conventions, pressure available to the load, mass basis and offered electrical configuration in the accepted selection.
| Parameter | Catalogue reference |
|---|---|
| Model | TC-CDU-L120R |
| Equipment type | In-Rack Liquid-to-Liquid CDU |
| Catalogue capacity | 120 kW |
| Flow reference | 190 L/min |
| Flow adjustment range | 20–100% |
| Head reference — confirm at required flow | 30 m |
| Power consumption reference | < 1 kW |
| Catalogue electrical supply | AC 220 V, 50/60 Hz |
| External dimensions | 482 × 870 × 217.2 mm |
| Catalogue mass | 85 kg |
| Pump arrangement | 1+1 |
| Rack height | 5U |
| Filtration reference | 50 μm |
| Condition | Reference / action |
|---|---|
| FWS temperature reference | 35 °C / 45 °C |
| TCS temperature reference | 40 °C / 50 °C |
| Approach reference | 5 K |
For Australian AI and HPC racks, review facility-water availability during peak plant load and the technology-loop pressure budget, including hoses and quick disconnects.
For NZ integrators, request a rack drawing and confirmation of the facility-water boundary from the host site. Include the agreed commissioning and spares responsibilities.
Model-specific catalogue PDF. Electrical and thermal suitability for your project require written confirmation.
Compare the In-Rack Liquid-to-Liquid CDU family · All CDU equipment
ToneCooling Australia Pty Ltd coordinates enquiries for Australian and New Zealand customers. Manufacturing is in Huizhou, Guangdong, China.
Confirm equipment, fittings, coolant, documentation, freight destination and commissioning responsibility. Local stock and on-site service are not implied.
Request the relevant drawings and inspection records. Site approvals, installation and system-level compliance remain separate from a component catalogue description.
Include your company, delivery country and postcode, project stage, prototype quantity and forecast demand. Confirm quotation currency and delivery terms in the commercial offer.
Prepare my enquiry by emailOpens an editable checklist; nothing is sent automatically. Attach drawings before sending. NDA arrangements can be agreed first.
Ask for the selected duty point, pump curve with pressure available to the load, general arrangement, offered electrical configuration, controls point list and acceptance-test scope. Identify document revisions in the quotation.
No. Request a configuration-specific selection using your coolant, air or facility-water conditions and required external pressure. The listed references are not a substitute for an accepted performance curve or test.
Stock, installation, commissioning and response times must be confirmed in the quotation. This page does not promise local inventory or an on-site service network.
No. Confirm the operating conditions, mechanical and electrical interfaces, fluid properties and acceptance test. Catalogue references must match the quoted configuration.
Yes. Include the New Zealand delivery location, site conditions and required documentation so that supply and service responsibilities can be agreed.
Compare model-specific operating conditions, interfaces and supply scope before selection.
CDU circuits and coolant compatibility. ASHRAE TC 9.9 (2019 PDF).
Its liquid-to-liquid examples support the circuit terminology used here. Reference only: no third-party endorsement, certification or verification of ToneCooling catalogue ratings is implied.
Other in-rack liquid-to-liquid models
Data centre liquid cooling