Review a rack-level cooling interface with a listed 482 × 870 × 177.8 mm envelope. The 75 kg catalogue mass makes rail support and service handling part of the selection, not an afterthought.

TC-CDU-L100R is a 4U liquid-to-liquid rack CDU with a 100 kW catalogue capacity reference and 160 L/min flow reference. It requires facility water and a verified rack installation. Confirm the simultaneous thermal duty, connection layout and external pressure before ordering.
Free PDF · no form required.
| Parameter | Catalogue reference |
|---|---|
| Model | TC-CDU-L100R |
| Equipment type | In-Rack Liquid-to-Liquid CDU |
| Catalogue capacity | 100 kW |
| Flow reference | 160 L/min |
| Flow adjustment range | 20–100% |
| Head reference — confirm at required flow | 30 m |
| Power consumption reference | < 0.8 kW |
| Catalogue electrical supply | AC 220 V, 50/60 Hz |
| External dimensions | 482 × 870 × 177.8 mm |
| Catalogue mass | 75 kg |
| Pump arrangement | 1+1 |
| Rack height | 4U |
| Filtration reference | 50 μm |
| Condition | Reference / action |
|---|---|
| FWS temperature reference | 35 °C / 45 °C |
| TCS temperature reference | 40 °C / 50 °C |
| Approach reference | 5 K |
Source: linked ToneCooling model datasheets. Catalogue values are references, not independently verified performance or a guarantee that every listed value applies at one simultaneous duty point. Confirm fluid, temperature, external pressure, electrical configuration, dimensions and mass basis in the accepted selection.
Obtain the actual rail and mounting drawing. The chassis is listed as 4U, but hose routing, fittings and hands-on service can require space outside that envelope. Define how the unit is supported during removal and whether adjacent equipment remains operating.
Confirm where facility water enters and how the technology loop connects to the rack manifold. The 30 m head reference does not establish differential pressure at the server after every intervening component. Use the branch schedule and the selected pump curve to set the external duty.
| Selection item | Input or reference | Required confirmation |
|---|---|---|
| Rack structure | 4U; 482 × 870 × 177.8 mm; 75 kg catalogue mass. | Confirm mass basis, supports, rail fit and removal clearance. |
| Thermal interface | Facility 35/45°C and technology 40/50°C reference pairs. | Request a selection at the actual facility inlet and load. |
| Fluid cleanliness | 50 μm catalogue filtration reference. | Check cold-plate requirements and filter service differential pressure. |
| Electrical | AC 220 V, 50/60 Hz catalogue entry. | Confirm site supply, protection and applicable conformity documents. |
List the CDU or skid, connections, sensors, controls and accessories included in the offer. Allocate installation, water treatment, flushing, filling, electrical connection and commissioning to named project parties. Australian or New Zealand enquiry support does not imply local stock, on-site installation or an included service contract.
Request the controlled drawing, selected duty, component schedule and agreed factory test records. Confirm site electrical requirements and applicable conformity documentation for the offered configuration; a catalogue voltage or a pump arrangement is not proof of project compliance or redundancy.
Send the following conditions for a configuration-specific offer. Capacity, included equipment, documents, delivery terms and installation responsibilities must be confirmed in writing.
Prepare my enquiry by emailOpens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.
ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.
No. It describes the catalogue chassis height. Connections, hoses, supports and service access need a separate installation review.
Other in-rack liquid-to-liquid models
Data centre liquid cooling