Equipment selection · Australia & New Zealand

TC-CDU-L100R: 4U Liquid-to-Liquid CDU

Review a rack-level cooling interface with a listed 482 × 870 × 177.8 mm envelope. The 75 kg catalogue mass makes rail support and service handling part of the selection, not an afterthought.

TC-CDU-L100R: 4U Liquid-to-Liquid CDU series reference equipment
Series reference image only. It does not establish the exact model configuration, dimensions, connections or included accessories.

Selection in brief

TC-CDU-L100R is a 4U liquid-to-liquid rack CDU with a 100 kW catalogue capacity reference and 160 L/min flow reference. It requires facility water and a verified rack installation. Confirm the simultaneous thermal duty, connection layout and external pressure before ordering.

Model datasheet

Catalogue reference values

ParameterCatalogue reference
ModelTC-CDU-L100R
Equipment typeIn-Rack Liquid-to-Liquid CDU
Catalogue capacity100 kW
Flow reference160 L/min
Flow adjustment range20–100%
Head reference — confirm at required flow30 m
Power consumption reference< 0.8 kW
Catalogue electrical supplyAC 220 V, 50/60 Hz
External dimensions482 × 870 × 177.8 mm
Catalogue mass75 kg
Pump arrangement1+1
Rack height4U
Filtration reference50 μm
ConditionReference / action
FWS temperature reference35 °C / 45 °C
TCS temperature reference40 °C / 50 °C
Approach reference5 K

Source: linked ToneCooling model datasheets. Catalogue values are references, not independently verified performance or a guarantee that every listed value applies at one simultaneous duty point. Confirm fluid, temperature, external pressure, electrical configuration, dimensions and mass basis in the accepted selection.

Check the loaded rack and the removal procedure

Obtain the actual rail and mounting drawing. The chassis is listed as 4U, but hose routing, fittings and hands-on service can require space outside that envelope. Define how the unit is supported during removal and whether adjacent equipment remains operating.

Confirm where facility water enters and how the technology loop connects to the rack manifold. The 30 m head reference does not establish differential pressure at the server after every intervening component. Use the branch schedule and the selected pump curve to set the external duty.

Selection itemInput or referenceRequired confirmation
Rack structure4U; 482 × 870 × 177.8 mm; 75 kg catalogue mass.Confirm mass basis, supports, rail fit and removal clearance.
Thermal interfaceFacility 35/45°C and technology 40/50°C reference pairs.Request a selection at the actual facility inlet and load.
Fluid cleanliness50 μm catalogue filtration reference.Check cold-plate requirements and filter service differential pressure.
ElectricalAC 220 V, 50/60 Hz catalogue entry.Confirm site supply, protection and applicable conformity documents.

Agree the equipment and acceptance boundary

List the CDU or skid, connections, sensors, controls and accessories included in the offer. Allocate installation, water treatment, flushing, filling, electrical connection and commissioning to named project parties. Australian or New Zealand enquiry support does not imply local stock, on-site installation or an included service contract.

Request the controlled drawing, selected duty, component schedule and agreed factory test records. Confirm site electrical requirements and applicable conformity documentation for the offered configuration; a catalogue voltage or a pump arrangement is not proof of project compliance or redundancy.

Continue the selection

Equipment selection enquiry

Request TC-CDU-L100R selection

Send the following conditions for a configuration-specific offer. Capacity, included equipment, documents, delivery terms and installation responsibilities must be confirmed in writing.

Prepare my enquiry by email

Opens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.

Include these project inputs

  • L100R rack and rail drawing / populated-rack service plan
  • Facility-water temperatures and available flow
  • Server manifold connections and branch pressure budget
  • Coolant specification and filtration / cleanliness requirement
  • Electrical configuration, leak detection and commissioning scope

ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.

Engineering questions

Does the 4U description include every installed clearance?

No. It describes the catalogue chassis height. Connections, hoses, supports and service access need a separate installation review.

Other in-rack liquid-to-liquid models

In-rack liquid-to-liquid CDUsTC-CDU-L35RTC-CDU-L50RTC-CDU-L120RTC-CDU-L150RTC-CDU-L200RTC-CDU-L250R

Data centre liquid cooling

All CDUsGB300 4G+2C kitGB200 kit