Evaluate TC-IPS-2000 for high-flow cooling-loop circulation in Australia and New Zealand. Review the DN200 connection reference, plant-room envelope and hydraulic selection before requesting an offer.
Series reference image only. Confirm the model configuration, dimensions, connections and accessories against the controlled drawing.
Selection in brief
TC-IPS-2000 is an integrated circulation skid with a 5000 L/min flow reference and a 2000 kW loop-duty reference. It does not remove 2000 kW of heat on its own. Review it where a separate heat exchanger or heat-rejection plant serves the loop, and confirm the pump operating point at the skid boundaries.
Define the high-flow plant interface before choosing the skid
At the 5000 L/min catalogue flow, main-header sizing, isolation valves and connection losses need to be included in the system calculation. DN200 is a nominal connection reference, not a verified flange standard or proof that the connected pipework is suitable. Provide the site piping specification and the required flow at each operating stage.
The listed envelope is 2200 × 1500 × 2000 mm, with a catalogue mass of 1950 kg. Ask for the installed mass, lifting points and maintenance withdrawal space rather than using the shipping envelope alone for structural or access approval. The 35 m head reference must be reconciled with the pump curve and internal skid losses.
TC-IPS-2000 catalogue reference values
Parameter
Catalogue reference
Model
TC-IPS-2000
Equipment type
Integrated Pump Skid
Catalogue loop-duty reference
2000 kW
Flow reference
5000 L/min
Flow adjustment range
40–100%
Head reference — confirm at required flow
35 m
Power consumption reference
< 50 kW
Catalogue electrical supply
3-ph AC 380 V 50/60 Hz or 480 V 60 Hz
External dimensions
2200 × 1500 × 2000 mm
Catalogue mass
1950 kg
Pump arrangement
1+1
Connection nominal size — standard to confirm
DN200
Filtration reference
50 μm
Condition
Reference / action
Loop temperature-rise reference
6.5 ℃
Heat rejection
Provided by separate system equipment
Fluid properties
Confirm concentration, density, heat capacity and viscosity
Source: the linked ToneCooling TC-IPS-2000 model datasheet, as transcribed in the supplied catalogue material. Values are not independently verified performance or a guarantee that all fields apply at one simultaneous operating point. Confirm the document revision, fluid, temperatures, measurement boundaries, dimension orientation and mass basis in the accepted selection.
TC-IPS-2000 versus TC-IPS-1600: what to compare
Both models list the same 2200 × 1500 × 2000 mm envelope and DN200 nominal connection. IPS-2000 lists 5000 L/min; IPS-1600 lists 4000 L/min. Choose against the selected hydraulic duty and electrical schedule, not reserved floor space alone.
Comparison uses the catalogue references listed on the pump skid series page and its linked model datasheets. Figures are not a project performance guarantee. Confirm controlled document revisions before procurement.
Free model datasheet
TC-IPS-2000
Use this model-specific PDF for initial comparison. Request the controlled drawing and configuration-specific duty confirmation for procurement.
Free PDF · no form required. The series photograph is not a certified arrangement drawing.
Agree the supply and acceptance scope
List the equipment, connections, controls, sensors and accessories included in the offer. Assign installation, flushing, filling, electrical connection and commissioning to named project parties. Local enquiry support does not imply local stock, an included service contract or on-site installation.
Request the offered electrical schedule and applicable conformity documents for your Australian or New Zealand site. Catalogue voltage, pump count and fan arrangement do not independently establish compliance or the required retained duty during a fault.
Opens an editable email checklist; nothing is sent automatically. NDA arrangements can be agreed before confidential drawings are shared.
Include these project inputs
Flow schedule for initial and ultimate plant loading
Pressure loss between named supply and return connections
DN200 mating standard and plant-room pipe routing
Foundation loading, lifting path and pump removal access
Duty/standby sequence, controls and acceptance test scope
ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Currency, freight, delivery schedule and included inspection documents are confirmed in the quotation.
Engineering question
Does the 2000 kW loop reference include outdoor heat rejection?
No. The skid circulates fluid. Heat-transfer and heat-rejection equipment, and the duty they must achieve, need to be identified separately in the project scope.