TC-CDU-A15R: 15 kW In-Rack Liquid-to-Air CDU

Assess the TC-CDU-A15R for Australian and New Zealand integration. The catalogue lists 15 kW, 25 L/min and a 482 × 870 × 443 mm envelope; confirm the simultaneous duty and installed configuration.

Model datasheet link · no form required · confirm the document revision and quoted configuration.

In-Rack Liquid-to-Air CDU — series reference image
In-Rack Liquid-to-Air CDU · Series reference image. Dimensions, enclosure and connection positions vary by model; the approved drawing defines the supplied unit.
View full reference image (opens a new tab)

What should be checked before choosing the A15R?

Reserve the listed 10U rack allocation and verify the offered mounting, service access and air path. A nominal 15 kW catalogue tier does not prove the heat rejection available at the project entering-air and coolant conditions.

Define a 10U liquid-to-air pilot arrangement

The A15R lists 15 kW, 25 L/min, 10U and 75 kg. For an AU/NZ laboratory or pilot rack, define the actual heat load, room temperature range and operating schedule before selecting this tier.

Compared with the 6U A6R, the A15R requires more rack height and a separate airflow review. Request cooling performance at the hottest expected entering air and check how loss of room cooling affects the server-loop temperature.

Heat passes from coolant to the receiving air stream. Confirm the room or plant heat-rejection path; this equipment does not eliminate the cooling load.

Liquid cooling for an existing air-cooled rack

Server cold platesLiquid-to-air CDURoom air / HVAC

Conceptual system boundary only. Connections, flow direction and controls require a project schematic.

Room heat balance

Include the IT load and equipment losses in the room cooling assessment. Confirm the air temperature at the CDU intake, not only the room thermostat.

Rack integration

Reserve the specified rack height, depth and mass allowance. Check rails, hose routing and maintenance access against the actual rack drawing.

Retrofit operation

Agree filling, venting, leak response and the sequence for connecting a live server loop before installation.

Catalogue references for TC-CDU-A15R

Source: ToneCooling catalogue model data and the linked model datasheet. Listed values are selection references and are not asserted to describe one simultaneous duty point. Confirm coolant properties, inlet/outlet conventions, pressure available to the load, mass basis and offered electrical configuration in the accepted selection.

ParameterCatalogue reference
ModelTC-CDU-A15R
Equipment typeIn-Rack Liquid-to-Air CDU
Catalogue capacity15 kW
Flow reference25 L/min
Flow adjustment range20–100%
Head reference — confirm at required flow25 m
Power consumption reference< 1 kW
Catalogue electrical supplyAC 220 V, 50/60 Hz
External dimensions482 × 870 × 443 mm
Catalogue mass75 kg
Pump arrangement1+1
Rack height10U
Filtration reference25 μm

Conditions behind the rating

ConditionReference / action
Air-side temperature pair — reference convention to confirm25 °C / 35 °C
Coolant temperature reference35 °C / 45 °C
Approach reference10 K

Selection for the project location

Australia

For Australian server rooms and research labs, select against the hottest expected indoor intake condition during operation. Outdoor summer temperature alone is not the CDU inlet condition.

New Zealand

For a New Zealand pilot or enterprise rack, specify room cooling availability, rack dimensions and service ownership with the same detail as the IT load.

Electrical configuration is a release item. Catalogue voltage and frequency options do not establish compatibility with the site supply. Confirm voltage range, phase, frequency, earthing, protection and the applicable product documentation before order.

Technical documents

Download TC-CDU-A15R datasheet (PDF)

Model-specific catalogue PDF. Electrical and thermal suitability for your project require written confirmation.

Continue the selection

Compare the In-Rack Liquid-to-Air CDU family · All CDU equipment

Prepare the flow and pressure-drop budget

Supply and project responsibilities

Australian customer communication

ToneCooling Australia Pty Ltd coordinates enquiries for Australian and New Zealand customers. Manufacturing is in Huizhou, Guangdong, China.

Quoted supply boundary

Confirm equipment, fittings, coolant, documentation, freight destination and commissioning responsibility. Local stock and on-site service are not implied.

Configuration-specific evidence

Request the relevant drawings and inspection records. Site approvals, installation and system-level compliance remain separate from a component catalogue description.

Prepare your enquiry

Send the conditions that determine the design.

Include your company, delivery country and postcode, project stage, prototype quantity and forecast demand. Confirm quotation currency and delivery terms in the commercial offer.

Prepare my enquiry by email

Opens an editable checklist; nothing is sent automatically. Attach drawings before sending. NDA arrangements can be agreed first.

[email protected]

Technical inputs

  • IT heat load and rack drawing
  • CDU inlet air and coolant temperatures
  • Available rack height, depth and load rating
  • Coolant and target flow / pressure loss
  • Electrical supply and room HVAC allowance

Questions before ordering

Which records should accompany the TC-CDU-A15R quotation?

Ask for the selected duty point, pump curve with pressure available to the load, general arrangement, offered electrical configuration, controls point list and acceptance-test scope. Identify document revisions in the quotation.

Are the catalogue power, flow and temperature values a guaranteed single operating point?

No. Request a configuration-specific selection using your coolant, air or facility-water conditions and required external pressure. The listed references are not a substitute for an accepted performance curve or test.

Is this equipment stocked or installed locally?

Stock, installation, commissioning and response times must be confirmed in the quotation. This page does not promise local inventory or an on-site service network.

Can I select from the catalogue rating alone?

No. Confirm the operating conditions, mechanical and electrical interfaces, fluid properties and acceptance test. Catalogue references must match the quoted configuration.

Can the same enquiry cover a New Zealand project?

Yes. Include the New Zealand delivery location, site conditions and required documentation so that supply and service responsibilities can be agreed.

Related selection and RFQ resources

Compare model-specific operating conditions, interfaces and supply scope before selection.

Technical reference and scope

Wetted materials and coolant compatibility. ASHRAE TC 9.9 (2019 PDF).

This reference is used for fluid-side integration only; it does not substantiate this liquid-to-air model’s heat-rejection rating. Reference only: no third-party endorsement, certification or verification of ToneCooling catalogue ratings is implied.