Heat rejection
Sum the rejected heat from all operating CDUs. Review room cooling capacity and the effect on adjacent racks.
Assess the TC-CDU-A120C for Australian and New Zealand integration. The catalogue lists 120 kW, 200 L/min and a 1200 × 1200 × 2000 mm envelope; confirm the simultaneous duty and installed configuration.
Model datasheet link · no form required · confirm the document revision and quoted configuration.

The A120C rejects heat to air, so the receiving room or plant needs an adequate heat-rejection path. Its listed 120 kW duty reference and 1200 × 1200 × 2000 mm enclosure require a coordinated thermal and space review.
The A120C is listed at 120 kW with 200 L/min and a 1200 × 1200 × 2000 mm enclosure. It may be assessed for a defined rack group only after the room heat-rejection path and available airflow are established.
Its catalogue supply uses three-phase options; the smaller A60C lists AC 220 V. Check the site electrical design and space allocation when comparing these tiers. Neither unit removes the need to reject the transferred heat from the building.
Conceptual system boundary only. Connections, flow direction and controls require a project schematic.
Sum the rejected heat from all operating CDUs. Review room cooling capacity and the effect on adjacent racks.
Provide a scaled layout showing intake, discharge, doors, maintenance zones and hose routes.
Define alarms, reduced-capacity operation and who owns the response when room cooling or liquid flow is lost.
Source: ToneCooling catalogue model data and the linked model datasheet. Listed values are selection references and are not asserted to describe one simultaneous duty point. Confirm coolant properties, inlet/outlet conventions, pressure available to the load, mass basis and offered electrical configuration in the accepted selection.
| Parameter | Catalogue reference |
|---|---|
| Model | TC-CDU-A120C |
| Equipment type | In-Row Liquid-to-Air CDU |
| Catalogue capacity | 120 kW |
| Flow reference | 200 L/min |
| Flow adjustment range | 20–100% |
| Head reference — confirm at required flow | 25 m |
| Power consumption reference | < 6 kW |
| Catalogue electrical supply | 3-ph AC 380 V 50/60 Hz or 480 V 60 Hz |
| External dimensions | 1200 × 1200 × 2000 mm |
| Catalogue mass | 480 kg |
| Pump arrangement | 1+1 |
| Filtration reference | 25 μm |
| Condition | Reference / action |
|---|---|
| Air-side temperature pair — reference convention to confirm | 25 °C / 35 °C |
| Coolant temperature reference | 35 °C / 45 °C |
| Approach reference | 10 K |
For Australian brownfield data centres, evaluate the existing room cooling plant at the summer design condition. Do not assume liquid-to-air removes the facility heat load.
For NZ colocation and enterprise retrofits, coordinate the landlord or facility operator’s airflow rules and maintenance clearances before freezing a cabinet layout.
Model-specific catalogue PDF. Electrical and thermal suitability for your project require written confirmation.
Compare the In-Row Liquid-to-Air CDU family · All CDU equipment
ToneCooling Australia Pty Ltd coordinates enquiries for Australian and New Zealand customers. Manufacturing is in Huizhou, Guangdong, China.
Confirm equipment, fittings, coolant, documentation, freight destination and commissioning responsibility. Local stock and on-site service are not implied.
Request the relevant drawings and inspection records. Site approvals, installation and system-level compliance remain separate from a component catalogue description.
Include your company, delivery country and postcode, project stage, prototype quantity and forecast demand. Confirm quotation currency and delivery terms in the commercial offer.
Prepare my enquiry by emailOpens an editable checklist; nothing is sent automatically. Attach drawings before sending. NDA arrangements can be agreed first.
Ask for the selected duty point, pump curve with pressure available to the load, general arrangement, offered electrical configuration, controls point list and acceptance-test scope. Identify document revisions in the quotation.
No. Request a configuration-specific selection using your coolant, air or facility-water conditions and required external pressure. The listed references are not a substitute for an accepted performance curve or test.
Stock, installation, commissioning and response times must be confirmed in the quotation. This page does not promise local inventory or an on-site service network.
No. Confirm the operating conditions, mechanical and electrical interfaces, fluid properties and acceptance test. Catalogue references must match the quoted configuration.
Yes. Include the New Zealand delivery location, site conditions and required documentation so that supply and service responsibilities can be agreed.
Compare model-specific operating conditions, interfaces and supply scope before selection.
Wetted materials and coolant compatibility. ASHRAE TC 9.9 (2019 PDF).
This reference is used for fluid-side integration only; it does not substantiate this liquid-to-air model’s heat-rejection rating. Reference only: no third-party endorsement, certification or verification of ToneCooling catalogue ratings is implied.
Other in-row liquid-to-air models
Data centre liquid cooling