Assess the L1000C for a shared rack-cooling project with a defined facility-water interface. Its catalogue envelope is 1200 × 1500 × 2000 mm; the installation route and supported operating mass need a project check.

TC-CDU-L1000C is a floor-standing liquid-to-liquid CDU with a 1000 kW catalogue capacity reference and 1800 L/min flow reference. These are selection inputs, not proof of simultaneous site duty. Confirm facility-water conditions, usable external pressure and the accepted operating point before procurement.
Free PDF · no form required.
| Parameter | Catalogue reference |
|---|---|
| Model | TC-CDU-L1000C |
| Equipment type | In-Row Liquid-to-Liquid CDU |
| Catalogue capacity | 1000 kW |
| Flow reference | 1800 L/min |
| Flow adjustment range | 40–100% |
| Head reference — confirm at required flow | 35 m |
| Power consumption reference | < 18 kW |
| Catalogue electrical supply | 3-ph AC 380 V 50/60 Hz or 480 V 60 Hz |
| External dimensions | 1200 × 1500 × 2000 mm |
| Catalogue mass | 1300 kg |
| Pump arrangement | 1+1 |
| Filtration reference | 50 μm |
| Condition | Reference / action |
|---|---|
| FWS temperature reference | 35 °C / 45 °C |
| TCS temperature reference | 40 °C / 50 °C |
| Approach reference | 5 K |
Source: linked ToneCooling model datasheets. Catalogue values are references, not independently verified performance or a guarantee that every listed value applies at one simultaneous duty point. Confirm fluid, temperature, external pressure, electrical configuration, dimensions and mass basis in the accepted selection.
Use a rack schedule to separate initial deployment, later expansion and the required failure case. The catalogue 1+1 pump arrangement describes pump count; request the retained flow and pressure when one pump is unavailable. Do not label the complete installation N+1 from this notation alone.
The listed mass is 1300 kg without a confirmed dry-versus-operating basis. Request the controlled mass and lifting information before assessing floor loading or transport access. Add working space for connections and service to the catalogue envelope.
| Selection item | Input or reference | Required confirmation |
|---|---|---|
| Facility reference | 35/45°C facility-water pair and 5 K approach reference. | Request the precise inlet/outlet convention and simultaneous duty. |
| Technology circuit | 40/50°C reference pair; 1800 L/min listed flow. | Check actual coolant and net external pressure at the selected point. |
| Power connection | 380 V 50/60 Hz or 480 V 60 Hz three-phase catalogue options. | Confirm the offered AU/NZ site-compatible electrical configuration. |
| Release records | Cabinet drawing, curves, control schedule and agreed tests. | Assign factory acceptance and site commissioning separately. |
List the CDU or skid, connections, sensors, controls and accessories included in the offer. Allocate installation, water treatment, flushing, filling, electrical connection and commissioning to named project parties. Australian or New Zealand enquiry support does not imply local stock, on-site installation or an included service contract.
Request the controlled drawing, selected duty, component schedule and agreed factory test records. Confirm site electrical requirements and applicable conformity documentation for the offered configuration; a catalogue voltage or a pump arrangement is not proof of project compliance or redundancy.
Send the following conditions for a configuration-specific offer. Capacity, included equipment, documents, delivery terms and installation responsibilities must be confirmed in writing.
Prepare my enquiry by emailOpens an editable email checklist; nothing is sent automatically. Attach your drawings before sending. NDA arrangements can be agreed before you share confidential files.
ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Include the destination postcode and required delivery date. Currency, freight, lead time and included inspection documents are confirmed in the quotation.
No. The catalogue fields must be reconciled for the specified fluid and simultaneous conditions. Request a confirmed selection and test boundary rather than combining separate reference values.