Equipment selection · Australia & New Zealand

TC-CDU-L1600C: 1600 kW In-Row Liquid-to-Liquid CDU

Assess the TC-CDU-L1600C for Australian and New Zealand integration. The catalogue lists 1600 kW, 2500 L/min and a 1200 × 1500 × 2000 mm envelope; confirm the simultaneous duty and installed configuration.

Model datasheet link · no form required · confirm the document revision and quoted configuration.

In-Row Liquid-to-Liquid CDU — series reference image
In-Row Liquid-to-Liquid CDU · Series reference image. Dimensions, enclosure and connection positions vary by model; the approved drawing defines the supplied unit.
View full reference image (opens a new tab)

Does the L1600C fit wherever an L1000C fits?

The catalogue lists the same 1200 × 1500 × 2000 mm envelope, but L1600C has a listed mass of 1800 kg and a flow reference of 2500 L/min. Verify floor support, pipework, delivery access and the offered configuration separately.

Plan a 1.6 MW tier around the facility-water envelope

The L1600C shares a 1200 × 1500 × 2000 mm catalogue envelope with the L1000C, but its listed mass rises to 1800 kg and flow reference to 2500 L/min. A common footprint does not make the units interchangeable: check the supported operating mass, pipe sizes and delivery route.

Use this tier when assessing a shared loop serving several racks. Ask for the selected heat-exchanger duty at the warmest facility-water inlet and the retained hydraulic duty with one pump unavailable.

The technology loop transfers heat through a heat exchanger to facility water. Confirm both circuits; this CDU is not an independent refrigeration source.

Size a shared liquid-cooling loop for multiple racks

Multiple rack branchesIn-row L2L CDUFacility-water plant

Conceptual system boundary only. Connections, flow direction and controls require a project schematic.

Staged deployment

State phase-one and ultimate loads separately. Check minimum stable flow and how future racks will be connected.

Facility interface

Agree heat-exchanger approach, primary flow, connection standards and the pressure boundary with the mechanical designer.

Operations handover

Request the controls point list, alarm actions, failover test scope and spare-parts plan for the quoted configuration.

Catalogue references for TC-CDU-L1600C

Source: ToneCooling catalogue model data and the linked model datasheet. Listed values are selection references and are not asserted to describe one simultaneous duty point. Confirm coolant properties, inlet/outlet conventions, pressure available to the load, mass basis and offered electrical configuration in the accepted selection.

ParameterCatalogue reference
ModelTC-CDU-L1600C
Equipment typeIn-Row Liquid-to-Liquid CDU
Catalogue capacity1600 kW
Flow reference2500 L/min
Flow adjustment range40–100%
Head reference — confirm at required flow35 m
Power consumption reference< 25 kW
Catalogue electrical supply3-ph AC 380 V 50/60 Hz or 480 V 60 Hz
External dimensions1200 × 1500 × 2000 mm
Catalogue mass1800 kg
Pump arrangement1+1
Filtration reference50 μm

Conditions behind the rating

ConditionReference / action
FWS temperature reference35 °C / 45 °C
TCS temperature reference40 °C / 50 °C
Approach reference5 K

Selection for the project location

Australia

For Australian modular PODs and AI halls, confirm the summer facility-water envelope, installation access and the split between equipment supply and on-site commissioning.

New Zealand

For New Zealand projects, coordinate delivery access, anchorage requirements and the site engineer’s structural review. No seismic qualification is implied by the catalogue.

Electrical configuration is a release item. Catalogue voltage and frequency options do not establish compatibility with the site supply. Confirm voltage range, phase, frequency, earthing, protection and the applicable product documentation before order.

Technical documents

Download TC-CDU-L1600C datasheet (PDF)

Model-specific catalogue PDF. Electrical and thermal suitability for your project require written confirmation.

Continue the selection

Compare the In-Row Liquid-to-Liquid CDU family · All CDU equipment

Prepare the flow and pressure-drop budget

Supply and project responsibilities

Australian customer communication

ToneCooling Australia Pty Ltd coordinates enquiries for Australian and New Zealand customers. Manufacturing is in Huizhou, Guangdong, China.

Quoted supply boundary

Confirm equipment, fittings, coolant, documentation, freight destination and commissioning responsibility. Local stock and on-site service are not implied.

Configuration-specific evidence

Request the relevant drawings and inspection records. Site approvals, installation and system-level compliance remain separate from a component catalogue description.

Prepare your enquiry

Send the conditions that determine the design.

Include your company, delivery country and postcode, project stage, prototype quantity and forecast demand. Confirm quotation currency and delivery terms in the commercial offer.

Prepare my enquiry by email

Opens an editable checklist; nothing is sent automatically. Attach drawings before sending. NDA arrangements can be agreed first.

[email protected]

Technical inputs

  • Phase-one / ultimate IT load
  • FWS and TCS design conditions
  • Rack manifold schematic and pressure budget
  • Delivery access, floor load and anchorage
  • Controls protocol and commissioning scope

Questions before ordering

Which records should accompany the TC-CDU-L1600C quotation?

Ask for the selected duty point, pump curve with pressure available to the load, general arrangement, offered electrical configuration, controls point list and acceptance-test scope. Identify document revisions in the quotation.

Are the catalogue power, flow and temperature values a guaranteed single operating point?

No. Request a configuration-specific selection using your coolant, air or facility-water conditions and required external pressure. The listed references are not a substitute for an accepted performance curve or test.

Is this equipment stocked or installed locally?

Stock, installation, commissioning and response times must be confirmed in the quotation. This page does not promise local inventory or an on-site service network.

Can I select from the catalogue rating alone?

No. Confirm the operating conditions, mechanical and electrical interfaces, fluid properties and acceptance test. Catalogue references must match the quoted configuration.

Can the same enquiry cover a New Zealand project?

Yes. Include the New Zealand delivery location, site conditions and required documentation so that supply and service responsibilities can be agreed.

Related selection and RFQ resources

Compare model-specific operating conditions, interfaces and supply scope before selection.

Technical reference and scope

CDU circuits and coolant compatibility. ASHRAE TC 9.9 (2019 PDF).

Its liquid-to-liquid examples support the circuit terminology used here. Reference only: no third-party endorsement, certification or verification of ToneCooling catalogue ratings is implied.

Other in-row liquid-to-liquid models

In-row liquid-to-liquid CDUsTC-CDU-L300CTC-CDU-L600CTC-CDU-L1000CTC-CDU-L2000C

Data centre liquid cooling

All CDUsGB300 4G+2C kitGB200 kit