Review TC-DCU-600 for outdoor cooling where part-load control, noise requirements and service access matter. Send the project conditions for a configuration-specific AU/NZ offer.
Series reference image only. Confirm the model configuration, dimensions, connections and accessories against the controlled drawing.
Selection in brief
TC-DCU-600 lists a 600 kW capacity reference and 2000 L/min flow in the same 6600 × 2280 × 2535 mm envelope as DCU-1000. The different airflow and temperature references mean it should be selected for its operating duty, not assumed to be a smaller physical substitute.
Specify acoustic and part-load requirements explicitly
The airflow reference is 240,000 m³/h and the liquid pair is 35/40°C. Where the project has a night-time noise criterion, specify the assessment location and required thermal load for that period. Request sound data for the offered fan arrangement; the catalogue airflow figure is not a sound rating or evidence of compliance at a boundary.
The 40–100% flow adjustment entry concerns the catalogue flow range, not a verified fan-speed range or a complete low-load operating sequence. Define how the cooler should respond when the process load falls, ambient temperature drops or circulation is interrupted. Freeze protection, controls and commissioning responsibilities must be allocated in the offer.
TC-DCU-600 catalogue reference values
Parameter
Catalogue reference
Model
TC-DCU-600
Equipment type
Integrated Dry Cooling Unit
Catalogue capacity
600 kW
Flow reference
2000 L/min
Flow adjustment range
40–100%
Head reference — confirm at required flow
35 m
Power consumption reference
< 43 kW
Catalogue electrical supply
3-ph AC 380 V 50/60 Hz or 480 V 60 Hz
External dimensions
6600 × 2280 × 2535 mm
Catalogue mass
4500 kg
Pump arrangement
1+1
Connection nominal size — standard to confirm
DN150
Airflow reference
240,000 m³/h
Liquid-side pressure-drop reference
< 0.9 bar
Fan arrangement
N+1
Condition
Reference / action
Liquid temperature pair — direction to confirm
35 °C / 40 °C
Outdoor operating-envelope reference
−30 to 45 °C, 5–90 % RH
Thermal selection
Confirm outdoor design point, fluid and fan operation
Source: the linked ToneCooling TC-DCU-600 model datasheet, as transcribed in the supplied catalogue material. Values are not independently verified performance or a guarantee that all fields apply at one simultaneous operating point. Confirm the document revision, fluid, temperatures, measurement boundaries, dimension orientation and mass basis in the accepted selection.
TC-DCU-600 versus TC-DCU-300: what to compare
DCU-600 lists 6600 mm first envelope dimension, DN150 and 240,000 m³/h airflow; DCU-300 lists 3300 mm, DN100 and 100,000 m³/h. Both show a 35/40°C liquid pair. Check capacity at the actual site design condition before trading plant space against selected duty.
Free PDF · no form required. The series photograph is not a certified arrangement drawing.
Agree the supply and acceptance scope
List the equipment, connections, controls, sensors and accessories included in the offer. Assign installation, flushing, filling, electrical connection and commissioning to named project parties. Local enquiry support does not imply local stock, an included service contract or on-site installation.
Request the offered electrical schedule and applicable conformity documents for your Australian or New Zealand site. Catalogue voltage, pump count and fan arrangement do not independently establish compliance or the required retained duty during a fault.
Opens an editable email checklist; nothing is sent automatically. NDA arrangements can be agreed before confidential drawings are shared.
Include these project inputs
Day and night heat-load profiles and required fluid supply temperature
Noise criterion, assessment location and permitted operating hours
Winter ambient condition, coolant concentration and freeze strategy
Part-load control sequence and loss-of-circulation response
Clearance drawing, DN150 interfaces and commissioning scope
ToneCooling Australia Pty Ltd coordinates Australian and New Zealand enquiries; manufacturing is in Huizhou, Guangdong, China. Currency, freight, delivery schedule and included inspection documents are confirmed in the quotation.
Engineering question
Does the flow adjustment range establish low-noise fan operation?
No. Fluid-flow adjustment and fan control are separate items. Request the offered fan-control sequence and sound data at the thermal operating conditions that matter to the site.